Moving between project stages
Keep concept design, documentation and later support identifiable. A single total is less useful when you need to estimate or review a particular stage.
Solutions
Design work extends beyond the drawings. Record coordination, site visits and changes to the brief so you can see the effort behind each project stage.
Start for freeHours and minutes
Separating initial design from changes to the brief helps explain why more time was needed. These example hours are not an architectural design benchmark.
A site visit, consultant meeting or review of a new layout may not add a sheet to the drawing set, but each takes time. A separate entry keeps that effort in the project record.
Create a project for each building or commission, with categories for concept design, documentation, coordination and ongoing support. Use separate projects for stages with independent agreements or time budgets.
When it helps
Keep concept design, documentation and later support identifiable. A single total is less useful when you need to estimate or review a particular stage.
Distinguish a change in requirements from refinement of the original solution. Name the stage and reason for the iteration so the difference is clear later.
Meetings, surveys and compatibility checks do not always produce new drawings. A separate category keeps this necessary work visible alongside design.
EXPANS · Solutions
Decide where you need to compare estimates with actual hours. Keep different commissions separate even when the same person works on both.
Run the timer in your browser or add the actual time after a meeting. Agree in advance on whether travel belongs in the engagement’s hours.
Name new iterations so they can be distinguished from the original scope. Review the hours before agreeing on the next stage.
Useful details
One project with a few categories can hold the overall hours. If stages have separate agreements or budgets, give them separate projects. Match the structure to what you and the client need to review.
| Level | Example | What it explains |
|---|---|---|
| Project | Commission A: concept design | The agreed stage and its scope |
| Work category | Layout design | The main design work |
| Work category | Coordination | Work with other contributors |
| Task | Layout option after brief clarification | The reason for another iteration |
Let’s look at an example
Layout options took 12 hours, coordination took 3 and the revised brief added 5. Without a breakdown, all 20 hours could look like one long concept exercise. Separate records show that a quarter of the time followed changed requirements.
Do not automatically exclude those 5 hours from the next estimate. Ask whether such changes are common in your approval process and whether the plan allows for them. For the current client, describe what changed; hours alone do not establish a right to an additional fee.
Example
Concept design took 20 hours: 12 on layout options, 3 on coordination and 5 on changes after the brief was clarified. We’ll review the issued materials and new requirements alongside those hours, then confirm the approvals needed for the next stage. Drawing completion is checked separately from time spent.
Common mistakes
Identify the stage or activity so a concept is not compared with a complete documentation set based on total hours alone.
Add the actual time when you return. Agree on the treatment of travel and ongoing support in advance.
Record the reason for an iteration in the task description. It helps the team discuss the process without guesswork or blame.
Use time summaries to discuss the effort involved in comparable commissions. Consider size, complexity, team and approvals separately: identical hours do not mean two projects have reached the same stage of completion.
Name the stage and action, such as ‘Concept design: layout revision after review’. Bring the issued materials and the reason for the new iteration to the discussion. Drawings and BIM models stay in your design tools; EXPANS records the time spent on the work.
First steps
FAQ
No. Start EXPANS, choose the commission and activity, then work in your CAD or BIM tool. Stop the timer afterwards, or enter the actual time manually.
Use a category within the project, or a separate project if it is an independent engagement. Choose the structure that gives your firm the totals it needs.
Yes. Enter the actual start and end times manually if your permissions allow it.
You can use tracked time in your own analysis, but area alone is not enough for a fair comparison. Also consider complexity, stage, scope and approvals.
Each records their own hours in the shared project using agreed categories. The total represents person-hours, not the elapsed duration of the stage.
Hours do not automatically establish completion. Check the status of materials and approvals through your project review process.